  PROJECT:GABON AKONDO OILFIELDYEAR: 2014
PROJECT INTRODUCTION:  AKONDO Oilfield is located at the northeast of Block Salsich, discovered by 9 wells. Block Salsich is 10km-45km to the northeast of Port Gentil in Gabon, with an exploration area of 1,260.04km2. This project is in order to establish 200K.T/YEAR crude oil central treatment station and appr. 60KM 8” transfer line and one temporary ship stop, point etc.
CLIENT:  Sinclair Knight Merz Limited
ENGINEERING:  SINOPEC
COUNTRY:  KENYA
VALVE:  GATE/GLOBE/CHECK/BALL VALVE
PRESSURE:  150lb-900lb
SIZE:  1/2"-16"
MATERIAL:  WCB/A105

  PROJECT:ANNUAL OUTPUT OF 500,000 TONS PROJECT YEAR: 2014
PROJECT INTRODUCTION:  The annual output of 500,000 tons engineering project is located Wushenqi Wushenzhao chemical project area,recorded in January 2011 in the Autonomous Region Development and Reform Commission, the project use the local rich resources of methanol as raw materials, to produce polypropylene, polyethylene and other downstream products of methanol project.The total investment is CNY10,421,760,000 , the plant covers an area of 197 hectares.
CLIENT:  ZMMDGS
ENGINEERING:  SSEC
COUNTRY:  CHINA
VALVE:  Floating/Trunnion Mounted Ball Valve
PRESSURE:  1/2"-10"
SIZE:  150LB-800LB
MATERIAL:  CF8M/A105/F316L/LCC/WCB

  PROJECT:SHUIFU-ZHAOTONG GAS PIPELINE PROJECTYEAR: 2014
PROJECT INTRODUCTION:  (1) Route:Shuifu-Zhaotong gas pipeline project, length of 260.5km, a designed capacity 497 million m3 per year. (2) Extension: length of 364km. (3) station and ancillary facilities: three gas distribution stations, seven pigging offtake valve chamber;34 shut-off valve chamber in Route and 23 shut-off valve chamber in Extension.
CLIENT:  Yunnan Zhongcheng
ENGINEERING:  Sichan Hongda Group
COUNTRY:  China
VALVE:  Ball Valve
PRESSURE:  DN25-DN400
SIZE:  PN4.0
MATERIAL:  A105

  PROJECT:Petroleum PRODUCTS STORAGE TERMINAL IN FISHING PORT, ANGOLAYEAR: 2014
PROJECT INTRODUCTION:  The project will be constructed in Luanda, Angola. There are 7 tanks used for Fuel oil,Gasoline and Gas Oil storage. The total tank capacity is 8.17×104m3.Gasoline and Gas Oil will be received from Jetties and Fish port and be transferred to Jetties and Fish portor be transferred by Truck in Terminal. Fuel Oil will be imported and exported from Jetties or be transferred by Truck in Terminal.
CLIENT:  Angobetumes
ENGINEERING:  CPPE
COUNTRY:  Angola
VALVE:  Motor Gate Valve/Butterfly Valve/Ball valve/Check Valve
PRESSURE:  3/4"-28"
SIZE:  150#/800#
MATERIAL:  WCB/A105

  PROJECT:PETROLEUM PRODUCTS STORAGE TERMINALLN MALANGE, ANGOLAYEAR: 2014
PROJECT INTRODUCTION:  The project will be constructed in Malange, Angola, 400KM away from the fishing port in Luanda, Angola. The main work includes three diesel storage tanks with each tank capacity as 5000 m3 ,One gasoline storage tank with capacity as 3000 m3. One water tank with capacity as 1,500m3, and process piping, fire systems, loading trestle and other facilities.
CLIENT:  Angobetumes
ENGINEERING:  CPPE
COUNTRY:  Angola
VALVE:  Gate/Swing Check Valve
PRESSURE:  2"/4"/10"
SIZE:  150LB/800LB
MATERIAL:  WCB/A105

  PROJECT:CPECC KAZAKHSTAN ZHANARUOER OILFIELD GAS TREATMENT & UTILIZATION PROJECT II,III PROJECTYEAR: 2013
PROJECT INTRODUCTION:  Zhanaruoer Oilfield Gas Treatment & Utilization Project 3th Gas Processing Plant is located in Aktobe, Kazakhstan, affiliated with CNPC-Aktobe Oil and Gas Corporation. The main process units have associated gas booster stations, desulfurization mercaptan device, dehydration mercaptan device, light ends unit, sulfur recovery unit and condensate oil stability & separation device, etc.
CLIENT:  The Republic of Kazakhstan Aktobe Binaerman - Koules Co., Ltd
ENGINEERING:  CPECC
COUNTRY:  KAZAKHSTAN
VALVE:  SULFER SHELL TYPE BLOWDOWN VALVE /SULFER CHECK/SULFER VENTING/BALL/SULFER DOUBLE ECCENTRIC BUTTERFLY/SULFER FLANGED TYPE THREE-ECCENTRIC BUTTERFLY/SULFER WORM FLANGED TYPE BUTTERFLY/SULFER WEDGE TYPE SINGLE PLATE GATE/STOP GLOGE VALVE/CHECK VALVE
PRESSURE:  PN25-PN63
SIZE:  DN15-DN300
MATERIAL:  WCB/A105/A105N

  PROJECT:EPC WELL GATHERING SYSTEM AT BADRA OILFIELDYEAR: 2013
PROJECT INTRODUCTION:  The Badra Oil Field is situated in Wasit governorate, 160 km southeast of Baghdad city. Development of Badra Oil Field Well Gathering System will consist of 17 oil production wells and afferent flow lines, 3 manifolds, 3 trunk lines and CPF Inlet Manifold.
CLIENT:  GAZPROM NEFT
ENGINEERING:  CPPE
COUNTRY:  IRAQ
VALVE:  SWING CHECK/BALL VALVE WITH ACTUATOR/MANUAL BALL VALVE/ELECTRIC BALL/TRUNNION MOUNTED BALL/FLOATING BALL/GLOBE/GATE VALVE
PRESSURE:  150lb-1500lb
SIZE:  1/2"-24"
MATERIAL:  A105/F316L

  PROJECT:EPC OIL EXPORT PIPELINE BADRA-GHARRAF AT BADRA OILFIELDYEAR: 2013
PROJECT INTRODUCTION:  Project Description:EPC OIL EXPORT PIPELINE BADRA-GHARRAF AT BADRA OILFIELD was developed in TWO (2) phases:Phase I: where minimum 15,000 BOPD will be produced, consists mainly of a gathering system of 8 wells; Central Processing Facilities, Oil Export Pipeline (Badra – Garraf; about 172km) and Tank Farm. The CPF shall be capable to produce up to 170,000 BOPD;Phase II, where 170,000 BOPD will be produced out of 17 wells in total.
CLIENT:  GAZPROM NEFT
ENGINEERING:  CPPE
COUNTRY:  IRAQ
VALVE:  FULL-WELDED TRUNNION BALL/SWING CHECK/GLOBE VALVE/INTERLOCK
PRESSURE:  150lb-600lb
SIZE:  2"-28"
MATERIAL:  LF2/WCB/A105N

  PROJECT:GARRAF LIGHT OIL TRANSPOR TATION SYSTEM (LOTS)YEAR: 2013
PROJECT INTRODUCTION:  Gharraf oil field is located in Dhi Qar province, and about 5km by northwest from Al Refarei city, 85km by north from Nasiriyah city. BADRA oil pipeline and PETRONAS light oil pipline connect in GHARRAF oil field. PETRONAS oil pipeline project includes a 28” light oil pipeline with length 92km, 6 valve chamber, receiver device, cathodic protection system, station control system, laying optical cable in one ditch, SCADA, solar energy, instrumentation and communication and other main contents.
CLIENT:  PCIHBV
ENGINEERING:  CPPE
COUNTRY:  IRAQ
VALVE:  CHECK/PLUG/TRUNNION MOUNTED VALVE
PRESSURE:  600lb
SIZE:  1"-24"
MATERIAL:  WCB/A105

  PROJECT:ZAWTIKA DEVELOPMENT PROJECTYEAR: 2013
PROJECT INTRODUCTION:  ZAWTIKA development project, the total length of pipeline project will be 74.5km, designed capacity is 600MMSCFD, diameter is 28" (711.2mm), material of pipeline is API5LX65, wall thickness grades include 14.3mm,17.5mm, 22.2mm, etc. Outer anticorrosive coating is using 3LPP and 3LPE two types. Line route: after Myammar offshore gas through shallow water view landing point, approach ZBV1 valve chamber, ZOC control center, ZBV2 valve chamber, ZMS metering station and eventually go into PPT gas pipeline in Thailand.
CLIENT:  PTTEP INTERNATIONAL LIMITED
ENGINEERING:  CPPE
COUNTRY:  THAILAND
VALVE:  GATE/BALL/BUTTERFLY/CHECK VALVE
PRESSURE:  150lb
SIZE:  1"-12"
MATERIAL:  WCB/A105/QT/COPPER

 Page Jump [ 1 2 ] Next Page Last Page

 

About Us
About Us
President’s Speech
Company Culture
Certificates
Service Advantages
Technical Support
After Sales Services
Products
Ball Valve Cryogenic Valve
6A Vavle Throttle Stop Vent Valve
Drain Valve Gate Valve
Globe Valve Check Valve
Forged Steel Valve Eccentric Butterfly Valve
Industry
Oil and Gas
Cryogenic Field
Power Industry
Chemical Industry
Wellhead Service
General Industrial Area
Achievements
Recruitment
Contact Us
Tel:+(86)-21-62608686
Fax:+(86)-21-63030787
Add:26th Floor, Zhongguancun Science and Technology Building, No. 2911 North Zhongshan Road ,Putuo District, Shanghai, China.
Email:sales@weilunnc.com
Copyright © 2014-2018 Shanghai Weilun Valve Group Co., Ltd    

偷拍色情网址|亚洲高清无码a|青青草绿色华人在线视频|522av亚洲